An update, if you can call it that. I can report that due to the great New Zealand latex famine of 2023 (and now into 2024) no progress has been made.
Here it sits… Waiting patiently…
Since I’m planning to have half a dozen or so tunnels on the layout, I thought it would be good to take a cast of each portal (left curve and right curve), plus a straight section so I can turn them out as I need them now the hard bit has been done.
Try to find moulding latex locally since October 2023 – impossible. My go to shop is out of stock, and the Sorry notice up for months. I’ve checked everyone else locally, even looked at the cost of a gallon from the States (over $400 landed) and apart from paying $40 for a cup of theatre make up - nada, none.
Today I bit the bullet and ordered 3 small kits of Smooth-On 40, mainly because they now showed less than 10 in stock. Ouch. Hopefully I’ve got a chance of closing in the tunnel before winter. That’s the plan anyway.
Cheers
N