Work is still in progress building the buildings for the layout…
Below are 3 factory fronts to go into the industrial park…
The red brick building is a 4-story factory…
Below is a gray 3 story factory building to go on another siding…
the last one so far is only the start of the factory… Eventually I plane to have a 2 story addition on top
which will extend over the 2 siding tracks, so that the tracks will be covered by the factory.
The building shown is the ground floor with the loading dock access…
Jane does a great job painting the buildings and putting them together…