Ok, so looking and thinking…I’ve always maintained that the WV&K NG line is a ng feeder that runs from a Standard Gauge interchange at Pearce to a river port at Port Lavender down a narrow marginally industrialized river valley tributary. Somehow the thought of modeling a river port town in Large Scale, without a body of water, just seemed unappealing. So I’ve got some ideas!
My On30 project sort of died two years ago and I haven’t really been able to rekindle interest , it was to be sort of a copy of the WV&K in On30, so there was nothing really different about it, just smaller. Now here’s the idea! The On30 layout becomes an extention of the Large scale line…The Port Lavender Terminal Railroad. The Large scale line would end in a yard, which would be represented by staging on the indoor line. The current layout will be re purposed into a general switching layout, using the supplies and components I’ve had stockpiled for the last two years. It means lifting track and rearranging some things. I’m thinking two separate switching areas, one a loading point for barges and car floats (note 'm not refloating the imfamous “car ferry” discussion) and the other a general industrial switching area.
To start will have to clean up all the crap that has accumulated over the last two years, and I started by getting new tubes for the overhead shoplights in there so I can see what I’m doing. Thought and or suggestions for industries to include?