The northern expansion to date. Got the bench work about 70% done. Still need to add shelving below but the upper deck measurements were accurate and things all line up. Its a mess right now but there is an organization to the clutter. This weekend will be lower shelving and adding the lift bridge at the workbench. In the end I’m going to have to unload quite a bit of now unusable stuff.
That stuff looks similar to what I was dealing with when finishing the shed. All my stuff was in boxes, but I had to move it dozens of times to clear work areas.
Great progress!
Big progress today. Track is down. The lift bridge which was by far the most difficult thing to assemble, is in place. I still have to add some wiring but today was a big day. Next up is building the platform above for the pizza. I had forgotten how heavy it was. I don’t know how I ever managed setting it up by myself.
Congrats Vic on the track laying and bridge setting!
You sure pack more fun per cubic foot than any space I’ve ever seen!
LOL I bought that years ago, it’s a genuine long leather jacket made for someplace like Wyoming. Its never been cold enough to wear, I really to take it to Salvation army.
Progress on the layout. All benchwork is finished have been playing around placing structure on the layout. Tomorrow I will be laying down some Gargrave track on.the storage levels and will being addressing covering the exposed woodwork under the pizza. Once I have that planned out I can connect the last wiring.
Vic, the layout look SUPREME! Does this reckless experiment include anchovies and pineapple?
Very big day, this evening I connected the last remaining power supply wires, started last weekend on the foam scenery, all the buildings are in place. I’m now fully operational. Some paint, and theres always scenery to do. But all major work is done. No pics right now, hope to post some end of this weekend.


















