Ok the tricycle was finally put away…
The last two days I did some minor work on the layout. I started to put some of the buildings up and planted the rest of the trees that I had. I also started to build a wall at the edge of my deck to create a block and a scenic point
I also hooked up the two switches so they spring back. I tried the V method but for some reason it was not keeping the points flush to the rail after the train would go through. I ended up using Davis Manyards idea with a brass rod, a spike and by drilling a hole into a tie and into the throw-bar. That seemed to work the best although the pilot on my Mogul derails on one when it tries to push the point over. The other switch is fine. My Climax has no issues going through. After the train passes the point goes back and sits snug against rail. A friend is going to give me two electric switch boxes from LGB I might try that and use as a rubber switch.
Rock work along the deck Still needs some tweaking
(http://oi61.tinypic.com/95n5o9.jpg)
I also got the well area leveled and measured. I got all the wood cut for the trestles. Now I just have to start building them. Next project.
(http://oi57.tinypic.com/v7t4rk.jpg)
Ranger station was put in.
(http://oi60.tinypic.com/2zqszk3.jpg)
Camp Kittatinny
(http://oi61.tinypic.com/2r59ij9.jpg)
overall view
(http://oi61.tinypic.com/2qa1enq.jpg)