Okay Bruce. You to Bob.
In the Wiki is a question -
More to come:
What is “operations”?
How do I set up a rail transportation system on my layout?
“Do I need every industry” I ship to/from represented on my layout?
What is ‘car forwarding’?
“How many people do I need to “operate” my layout?”
Are there computer programs to help?
Can I still have a loop in my operational layout?
What is a Timesaver? An Inglenook?
I can answer the last Question and did in the LSC Operations Forum -
“Timesaver” is a switching puzzle developed by John Allen in the 1960’s. It is based on the length of the sidings related to the freight cars and engine and is played against time or numbers of moves needed to exchange like cars for like cars (box car for box car). There is an example put together by Alan Wright that can be downloaded and tried on your computer at -
http://www.precisionlabels.com/shunt/jg3tims0.html
“Inglenook” is a switching puzzle based on 3 tracks of different lengths and the number of moves it takes to move the freight cars between these tracks. There is an example put together by Alan Wright that can be downloaded and tried on your computer at -
It looks like it is a closed subject. At least Ken thinks so.
So how do I wack that answer into the Wiki? I’m registered, but got lost in cyberspace twice trying to read the instructions (not enough pictures).