Large Scale Central

Turntable Build

OK I have been ask to show the turn table build… I have put pic in my photo bucket of the builds. I started off with .125 AL 5 by 10 sheet cost around $200 bucks, the deck not p[ictured yet is 1.75x 3" rec tubing. the center post is 1" al rod with a 1/2 setp that fits in the bottom of the pit with a 1/4 bolt and washer on the back side to hold it in. On the bottom of the deck will be a soild block of AL with a ream out 1" hole with about .002 clearance to piviot on. The pit and top ring was water jet cutted which runs about $150 hr around here. the sides of the pit were made of extra material from the 5 by 10 sheet… More pics to follow as work gets done. If some one wants to post the pics on here please fill free to do so.

http://s615.photobucket.com/albums/tt235/danielpeck/Turn%20table%20Build/

Been to the powdercoaters and got the milling and turning done… Just got to finish the bridge and install the track around the bottom of the pit.

(http://s615.photobucket.com/albums/tt235/danielpeck/Turn%20table%20Build/?action=view&current=DSC00213.jpg)

Great work Daniel, Someday will build me one! It’s on my to do list, I already have the turntable part just need to get going on it. Next years project maybe!! Regal

Daniel
Is that one that goes at Cranberry on Jim’s layout??? Looking good.
Rodney

(http://s615.photobucket.com/albums/tt235/danielpeck/Turn%20table%20Build/?action=view&current=DSC00215.jpg)

IT IS DONE!!! and yes Rodney of Cranberry… it is in the ground and leve when I left and the 8’ plus snow shed is in to and I WILL NOT MAKE ANOTHER!!! 1,100 feet of metal all welded!!! Watch for Video to be upload today from house exit to house entrance!

…:)…

(http://i615.photobucket.com/albums/tt235/danielpeck/Turn%20table%20Build/DSC00215.jpg)

Beautifiul work!

Very nice Daniel

Sweet! Does the pit have drainage?

1/4 inch holes 2 of them and rock pit under the table.

Nice work