A couple of weeks ago i removed about 20’ or so of right of way so i could drop a tree that was up against my barn. I decided in putting it back in place it was time to get this section closer to the finish line. at the time it was track supported on spline. if a derailment occurred (thankfully non have) it was a long way down to the grass. on this hot and muggy day here in New England i got it finished for now and installed the outside portion of the lizard head snow shed. the interior shed configuration is still being worked out so that some access is still available to the track.
1 Like
I almost didn’t like you any more but now your title makes sense.