Hi all,
They’re making progress on a very large project and the first breakthrough had a deviation from the axis of 20mm (.787") in the vertical and 50mm (1.968") in the horizontal plane. This is after the giant boring assembly [total length 400m (1312ft) bore diameter 8.8m (28.8ft)] had covered 13.5km (8.4miles) in the past four years.
Well, it was a big enough occasion to make the cover of the “Swiss Review” (mag for the Swiss ex-pats).
It’s just like drilling holes in a very large Swiss cheese.
Minor correction: the distance from portal to portal is 57km, the Channel tunnel is 50.5km.
The total of all the bores (tunnels, ventilation shafts, access shafts etc. etc.) will be 153.5km (95miles).