Large Scale Central

Switching Layout - first go

Hello:

Before I get my indoor layout started I decided to set up a temporary switching layout.

Seven switches with three blocks. I used the track.app to design it.

Open to your suggestions and feedback.

Very similar to track puzzle called “Time Saver.” Posted on this forum and others. I have also seen them at train shows too. To much mind thinking for this old man to try.

https://gdlines.org/GDLines/Timesaver.html

image

I do want to build one to watch others burn the coal trying to beat each other’s time!

3 Likes