Every year we do our spring repairs, but this year it has been a very wet winter for us. Now that the weather is starting to get better, we are starting to pulling our building up for minor repairs. Two of them are kind of long and take two of us to set them up on saw horses. We started with Bowers Whrs at the set up area.
Whrs needs a new roof and over head crane is stuck.
And pulled up Wilsonville and set them up on saw horses. Easy to just unplug the sound and lighting to be able to move them. Wilsonville is the longest at almost 12 foot.
We see the Eng. house remote doors has a remote wire off the motors. Also some lights came loose from the over head wires out front.
Then after we get these ready to go back in, then start Maint.on the Swing bridge & Bakers Acres and do some ballast/track repairs.
Maybe in a month, have some trains running. LoL
P.s. Michael Kirrene
Here are the photo i was trying to show you in our chat.