A little change on the railroad that led to some additional real estate becoming available which led to an additional industry/support facility coming to life.
Every since building the switchback with lift bridge route into the Redding yards (way back in this thread somewhere) the main line has been plagued with a radius that was just a little to tight for locos like Consolidations and longer cars such as Combines, Couches, etc.
In this view the new route is completed. The switch in the foreground was moved back, towards the camera, about 18 inches and the buildouts on both sides for the bridge approach were torn out and rebuilt. This not only eased the approaches to the bridge but also eased the route into the yards to the right.
The new real estate came into being between the two realigned tracks.
Deciding on an ice house and icing platform we had to get a little creative to make it work in the space available, sound familiar? Anyway here is what I came up with.
The drone view.
Still playing with the new Cricut and am not real excited about some of the results. Check out the Lassen Ice lettering and notice how “ragged” some of the letters are. Maybe I am just going too small, those letters are about 1/2 inch in height.
Oh well, on to the next project.