It that time again of replacing bad track boards that has almost gone over time. This area of the Helix is around 15 yr’s.s old and has had lot of heat and been soaked/ wet over the years and now has taking it tole on this part of the R.R…
Here is the area that has most of dry rot and now being replaced.
We re-placed it with latex painted boards and then it will be re-ballasted.
We re-palced about 16 foot in this area on the Helix down to the Swing Bridge. Also, we had to move the lower main line over about 3 inches away due to lower main line track keep moving from tree roots. Had to remove the underpass and will re-locate it later.
For our train group guys, here is the link for more photos of the mess being replaced.
http://s187.photobucket.com/user/noelw71/library/?sort=2&page=1
Then scroll down to " Re-paring tracks boards "
Later on, the Pine Tree Jct. Cattle spur need re-ballast after we raised it. It been getting flooded from Ouch Creek…