Thanks Sean.
My goal is still to have these complete by April 1st., and then I’d like to just relax this summer and run trains. I picked up two used GP38-2’s which were heavily weathered. I’m going to patch them for Helm Leasing ( HLCX ) and they’ll be the work train power this year. The SD40Qrm and SD40-2w will team up for Road Switcher duties.
I’m really looking forward to testing out the RailPro system in the backyard.
Next winter, I think I need some yard power. I’ve had a GP9 in pieces on my desk for ten years, so maybe it’s time to do something with it. I have a second in storage so I’m planning a “Doug and the Slug” set. ( GP9rm/slug )
I also have a parts bin which is growing, and I’m toying with the idea of an Illinois Central standard cab SD70.
I just picked up four poorly painted Bethgons which I need to strip and I’d like to rebuild them as Trinity coal gondolas.
Shane