Bill Barnwell said:
Joe, excellent job you and members have done on the G gauge track set up, sorry to been ill during the run and final days of building, hopefully I will be able to get back up there when better, Thanks, Great job, Bill
Bill,
I was sorry to hear of your health problems. Come and visit any time you can. We are not done with it. I will be starting a freight yard in August. I also have to created several electrical blocks for the three main lines and the up coming freight yard so the guys with track powered engines can operate separately on the three main lines. Right now all main lines are powered together, three sidings are separate blocks.