I did a post on this over on “the other place” and no reaction. Normal over there.
Had Barry’s drive installed by Jonathan Bliese and delivered yesterday. WOW!, what a smooth running engine I have now. Still needs some break-in as the Connie had very little runtime (1-2 hrs.) because I didn’t want the old Bachmann to fail before I got the new BBT drive installed. After Jonathan had the old drive removed, he found the main drive gear WAS broken in FIVE places. This is after ONLY 1-2 hours on rollers and a friend’s FLAT elevated layout! So much for Bachmann’s drives. Thank goodness for Barry and his drive!
Thanks again to Barry for his drive AND to Jonathan Bliese of Electric Model Works in Chino, CA. for his outstanding installation.