Large Scale Central

Portable Layout Building Log

With the larger layouts temporarily on hiatus, I am planning to keep my skills going on the workbench with a little something I’m hoping to make as a portable display layout http://1stclass.mylargescale.com/vsmith/Large%20Scale%20Pizza%20layout_BTS_2008.pdf A 3’-0" square “micro” layout, a pizza layout by definition, utilizing the old xmas tree base layout I’ve had for a couple years now. The old plywood base with its hand bent rail will become the portable Borracho RR display, with handlayed track, blue foam “mountains” and a small town of very small, detailed structures climbing the hill over the track. It will have detachable legs and felt pads so it can either be freestanding or set on a tabletop. It will be based on a very small HOn30 micro-layout I built a while ago. Its designed to be portable by myself alone, in my current car, hence the 36"square size, anything larger would be unmanagable to carry and would realisticly require a larger vehicle to transport.

If it comes out like I hope it should be a nice draw where ever its set up…progress pics when I can :smiley: Some current pics Overall view, ties are 3/8 x 1/4 basswood cut down, to be stained after placement. the tunnel portals are from the indoor layout.

Close up of track and ties, I’ll be using Micro Engineering 3/8" spikes and I will spike every tie, I have an Aristo track gauge and will use the max gauge setting as the ultra tight curve tends to need additional wiggle room for the wheels. Nothing is glued down except the corkbed; I’ll begin gluing down the ties tonight.

I have blue foam for my “mountain” and the portals need some reworking, but first comes track laying! :smiley:

Looks like a very nice project. . . let us see more soon.

All the ties are glued down and begun spiking outer rail down, its the guide rail, and the inner rail will be gauged off it once its down tightly. Spikes are Micro Engineering medium 3/8" long, and they go down very nicely. Pics to follow.

Now that’s one layout that will be hard to downsize because of track prices…:smiley:

Progress pics: Track under testing:

Ties stained:

Tunnel test fitting:

[:D]

A project that only a crazy man could conceive of and execute. :smiley: It’s looking good Vic and this is going to be an exceptional project using the minimum possible space. :slight_smile: