I took this picture a few weeks ago after I started, some tape and an Idea of where this will reside
Arizona campaign laws say that the crooks politicians have 2 weeks after the election to remove signs, I wait a weekend after and clean up my neighborhood of blight. So after testing the fit and size of the building and a plan fully in place work got in the way, and home repairs and other things.
But today I was off and hit it hard trying to get something done
No I have never tasted this brand, but my brother in law Mike brought a bag of cans and this
A Fiskars crimping tool, so now I can do some more roof panels! so I set out and made one piece to use, and installed it and framed it in
back side view, I think this will make a passable roll up door for the warehouse to the rail dock, I decided to just go direct from rail car into the warehouse instead of having a dock between them.
From my junk pile from building my bridge I had all this leftover milk crate parts so I came up with the idea
maybe these can make windows
A little work on the band saw and these might be usefull as windows
trying out different looks. then I started to clean up the frames to cut the holes out for them,… oops
razor blade, meet left index finger and sacrifice to the build gods
this picture actually doesn’t do my dumb move justice, on the side, near the joint where your finger wants to bend and stretch, this is going to take some time to heal. and afterwards while helping wifey prepare dinner I found out this finger does a lot of picking up things like pots and pans and the cut is right where the weight of a pan wants to sit, so We will see how much more I can get done tomorrow.