More track work going on…
Switch going into the station area. Connects the main line with the future city street car line.

Approach to the Sprite Junction station. Main line is to the left iin this shot, with the long platform. To the right is the Sprite City Transit platform, which will handle traffic from the future street car line.

At the end of the brick patio, facing the station will be a small diner/cafe. Tables and chairs with umbrellas will go between the two buildings.

Where I ran out of ballast. I need about two hundred more pounds to finish the station area and the other switch area.
