Large Scale Central

Northern Pacific in 0

three rail… well, that is a question of personal taste.

apart from that, i find the layout very impressing. must have taken an eternity to build that.

most educative for me is the way how buildings, semi-flats, flats and background paintings are combined.

One particular thing that always comes up…how hard is it to wire a three-rail reverse loop?

AC? or DC?(http://www.largescalecentral.com/externals/tinymce/plugins/emoticons/img/smiley-wink.gif)

In '55 I was King of the Road running the hand car through out the house on our double reverse loop pike. Mom only allowed it on the floor, from Christmas to New Years… (http://www.largescalecentral.com/externals/tinymce/plugins/emoticons/img/smiley-undecided.gif)

AC. I had the option of bridge rectumfriers in each loco…and I have the Marn-0-Stats to run it. But, that’s fixed-point of control, and as big as this is, I wanted walkaround, so when the two more All-Trols showed up in this latest acquisition, that’s what I intend to do.

Oh…and reverse loops…you do nothing. Never changes polarity.

And you see the ACME switch controllers imbedded in the fascia? I have lots of them. Installed, new in the box, plus all the ones from Bill’s layout. Simple, bulletproof.

Handheld plugged into a remote box on the other side of the railroad. I need to mount some eyelets on top, to hang from hooks under the fascia.

TOC

Curmudgeon mcneely said:

Oh…and reverse loops…you do nothing. Never changes polarity.

I know. That is one thing I envy about 3 rail O (and 3 rail HO).

Craig Townsend said:
That’s realty cool Dave. In all the years that I’ve known you, I’ve never have had a chance to see the basement layout. Looks good.

I guess I’m one of the anointed ones. I got a private tour. (http://www.largescalecentral.com/externals/tinymce/plugins/emoticons/img/smiley-laughing.gif)

The SE corner of the basement. South yard throat in, tracks laid out heading northward. New outer double-track main with crossover in, screwed down, through the tunnel, ready to curve around and connect with switches to existing double track near basement door.

TOC

Love it.

Steve Featherkile said:

Love it.

Suck up

" Rooster " said:

Steve Featherkile said:

Love it.

Suck up

Whiskey Tango Foxtrot, over.

New junction installed, wired and tested.

Guessing you have a separate 200 amp service for the RR considering it’s 3 rail Lionel. Either way Neil Young would be proud.

Is that “Malfunction Junction Jr” ?..(http://www.largescalecentral.com/externals/tinymce/plugins/emoticons/img/smiley-wink.gif)

Yup. You screw up, you have a big mess to clean up. If you scale time, how much more often does it happen in 1:52-ish than 1:1?

good stuff…