Finally all the track is connected and attached to the frame. Electric connections completed too. Next step is to add surface material and place structures in final locations. The buildings on the frame are simply there to see what room is left for a townsite and other structures. Will be snug I think, but will work. The larger buildings will be placed in the center of the layout on the ground to form another townsite. More on that later. Track needs cleaning before surface material is applied. I used 1" painted exterior high density foam for the track base. Durable stuff, will last years. Anyway enjoy the pics.
Bridges are temporary until I can make better ones. Layout is about 170 feet. Two mainlines and three sidings. Enough to keep me busy. Next year, building lighting, plantings and electric switch connections. Getting impatient to run some trains.
I DON’T KNOW WHY THE TEXT IS DOUBLE POSTED AGAIN. FORGET THE PREVIOUS POST UNTIL I GET BOB TO DELETE IT.