In Connecticut, I used JMRI to create train orders / switch lists. The layout was large enough, both indoors and outdoors, that I could run 7-10 car trains which resulted in a large number of moves. JMRI, when it was working well, served this purpose well.
Here, on my very small indoor switching layout, 3-4 cars is about the maximum train length and there are only 4 industry sidings. I could start fresh with JMRI, but it hardly seems worth the effort.
I do like the way JMRI laid out the Train Manifest, but typing that in by hand for every train, even with a template, might get old fast.
So it’s decision time. Do I A) spend a few days setting up JMRI from scratch, or B) spend a similar amount of time creating a template to fill in manually, or C) just keep writing them out by hand on blank paper.
I’ve spent some time on thee web looking at blank forms, but so far nothing has appealed to me.
Part of a Train Manifest from the old layout for those not familiar with JMRI reports…