Got some time to tackle the roof. I wanted to make this roof different from all the others. I made some card stock Fit ups.
There will be a cupola on the top. Layered out the patterns on 3mi sintra.
I beveled the adjoining edges with a finger plane to better fit.
Taped up the joints.
And folded it up for glueing.
And glued it up.
Note that I put reinforcers in the joints, but only on the inside and not on the overhang. I have found that placing the pyramid upside down inside the building, puts good pressure and alignment to the roof panels.
Back to the hospital for the night. My body is starting to adjust to the awake all night, sleep the mornings. Est. 7-10 more days.