So I have mentioned that I am changing themes. Not track so much but themes. And this blank canvas is one of the first things I want to tackle. I asked about cenemt rock casting well that is part of this. In the area that would extend beyond the bottom of this picture is where the rocky cliff is going to go. And then this part of the bench (maybe the entire bench) will be a mine. One of the premier mines in Burke, ID at the turn of the Century was the Hecla mine.
Photo from the Barnard-Stockbridge collection at the University of Idaho
It has some key features and is very typical of the turn of the century silver mines in the area. One of the reasons I want to do this mine is I have a nice track separation at this point of 12" So I can add ore bins that extend from the bench down to the lower track. The lower track is even a duel set of tracks so the ore cars can be parked and not block the mainline. then I want to sprawl the mine works across the whole bench.
Big dreams. May take the rest of my life time. But isn’t that the best part? Not sure how I will incorporate my wye track but I will make it work. Not looking to replicate the Hecla, just imitate it so it has the right feel.
i will have a second mine that will be the Hercules which in reality sat up Gorge Gulch and brought ore down by tram to Burke. Since I have been talked into doing and Fn2 section I will build the Hercules in another part of my yard and have the 32mm track run to the tail of this wye. It will dump ore into ore bins at the far end of the layout but then continue onto the bench to a small freight depot so goods can be picked up and hauled to the mine on the compressed air tramway.
I need to get busy. I am 51 and will be dead in a short 35 to 40 years. I better hurry.