Last Friday, I got my carpenter over, and had him install the foundation fot the ““Planter Shelf””, that the upstairs train layout will traverse… Below are some pictues of the foundation… This picture below is one “Planter Shelf” that we had installed on the wall, separating the Breakfast nook and the Sunroom…
The below picture shows were the foundation framing connects with the existing planter shelf, and head (left) into the kitchen and will run along the tops of the kitchen cabinets.
The connection with the kitchen cabinets.
The below picture shows where the track will run from the kitchen, thru the wall, and onto the nw framing in the Dining room…
The below pictures shows the framing along the living room wall…
It connects thru the wall to the Planter shelf shown in the first picture in this entry… Next step, is to wrap the framing in drywall, then tape and mud in the drywall, then texture and paint tthe “Planter Shelf”, to match the existing wall color…