On Friday, 23 August 2019, The first operating session was held on the basement layout… The bottom portion
is strictly the freight yard for outside operations… The top layout is actually operated as a separate layout…
This provides playing with trains during rain, snow, cold and hot times during the year…
Below I am watching Ric as he works the yard setting up a consist for the Eastbound train.
the 2 tracks on the right is the mainline and a siding… The 6 tracks to the left are the inside freight yard…
The far right is an industrial park.
The yard lead comes out close to the passenger station… A tourist special is sitting at the station awaiting time
for it’s departure…
Mark G has his locomotive and caboose ready awaiting his train to be set on the siding so he can hook up and depart.
Getting setup…
Mark G getting his train in order behind the engine servicing facility.