So I decided my yard needed an ash pit. I did a lot of research I won’t bore you with, but here are most of my steps:
First I weathered some track, cut it for the ash pit and leads, then filled in the “holes” in the side with clay, repainted, and installed.
Here you can see the tracks leading up the the ash pit. My research told me to keep it away from main buildings and structure (fire danger apparently, also hence the red water holder) so I put it on the last track in the yard.
So skipping ahead, I carved the pit and steps out of the insulation board base, and started adding platforms. Now that I see this, I realize I haven’t put in the guard rail I was intending to install, so I guess I’ll have to go back and do that.
Three guesses where the ashes came from ? ! ? !
And here’s everything more or less finished on the pit itself: (By the way, I love what I did with that shovel !)
That left the fascia to be finished up, although I want to add some shrubs and sticks:
So there we go. Thanks for taking a look.
edit because my typing sucks tonight!