The 2025 Mik has concluded but the building continues on my Schnabel. I have added weight and changed the main pivot points from the original build. There was too much overhang towards the center when the 12" deck with the 500 ton Nuclear pressure vessel load was on it which caused it to droop and drag on the ground in a tight curve. The pivot points were moved toward the center but it was too much which caused other problems such as snagging on portals and bridges. The points were then moved between the old and new and a happy median was reached.
Next up is to build a transformer load for it.