Guys, It’s been snowing here pretty solid, another 14 inches on the way, with all the inside time I’ve had has allowed me to get back into building bashes again. this project was real quick and took all of a day and a half to do (gotta let the paint set-up :rolleyes: ) I had the office part off of a USA Crane Tender Caboose and the frame and handrails off of a Bachmann 2 axle caboose laying about from a previous project. anyway I started with this: Bachmann Bobber
USA Trains Crane Tender
and after a little paint and some chain I had laying in the parts bin I ended up with this little logging caboose
…
…
I’m pleased with how it turned out being that it’s built from left-over parts :rolleyes: