I took advantage of the dry forecast and run some trains. Engine #14 had to sit in for #1332. Besides engine #1332, there is also a combine in the paint shop. Fortunately the combine has none of the engines gremlins. This is the first time the Observation Car and Coach have run together.


A coupler failure soon retired the Observation Car.

#14 gets ready to leave with a load of empties heading north.

The days second coupler failure.

Underway again

A shot from the upper end of the RR.



