Hi all, An acquaintance in Germany asked me for some suggestions for a layout. He has a nice piece of real estate i.e 30m wide by 40m deep. Here’s what I would build in that space.
The whole shebang
The location where they mill wood and smelt silver
The junction to the silver mine
Tracks at the mine
Logging section All spread out to create better visuals, with plenty of room to step up to the locations where switching needs to happen and a continous loop with three locations for meets and/or passes for those times when the operator(s) are too tired to figure out the switching puzzles at the mine or on the logging line.