An update on the progress of my layout.
Instead of loading lots of pictures here is a link to my Blog that has all the details and pictures.
Be my guest to have a look around.
Well it has been a long time between posts and I am making some major changes to the layout.
In fact I am totally re-configuring it from 2 loops in parallel to “point” to “point”.
I dismantled my HO layout in the shed and was left with a large area that was just asking for some train activity.
The blog explains all but just saying it will present some really good operating action when finished.
This is the latest blog update showing where I am at with the railway re configuration
Hey Gap,
Would you tell us a bit about your bridge in the background?
If you are referring to the High Trestle; See Mainline Construction Logs, Stage1, posts 4-9 inclusive (there is a low trestle in there)
This is the bridge that caught my eye.
That bridge is made from an old side safety rail from a double bunk, part of a frame from a dog bed and part of a bread delivery crate.
I have now torn that area down to make way for an expansion progress of which I am documenting here.