Yesterday we began building the south passing siding switch at Pogue. Switch building is a very slow process and with a large crew, a lot of time was spent imitating DOT workers 
As always, the first step is laying out ties. The railroad staff had previously marked out the location of the head blocks and transitions to various length switch ties. Once the head blocks were in place, standard length ties were laid out to the south and switch ties laid out to the north before placing the stock rails through the head blocks…
Once these rails were in place, the points were laid out…
And the diverging route running rail was placed…
Rail was brought in to extend the main line point rail…
Joining rails to the points required drilling new bolt holes to match the joint bars we are using…
The main line running rail was extended and the frog placed…
Before lunch we joined and gauged through the frog…
I forgot my phone in the car after lunch, and it was too far to walk back for it. Ill grab new pictures on Tuesday when we go back to finish up and start laying the siding.