Those of you who have visited my layout probably remember the single AMS passenger car side sitting at Vance Junction, looking out of place. well I finally did something about it. A while ago I did a 3d model for the roof for a commercial model co. So the roof started with that with a upscale, cut it in half, then Scrunched up to fit in 7/8" space. yes that is correct. the AMS Body had its windows covered with blue tape, and I sacrificed one of the ends I had buy cutting down each side to 5/8", and screwed and glued this to the main side. the sides and roof were heavily weathered using successive layers of paint, that were scratched between coats.

the platform was made up of a piece of 3/8 cabinet grade plywood, over layered with 3/4 wide x 1/8 thick planks, and stained. the board was warped a little and to straighten and mount the side I applied a 1/2 " x 13/32 block of pine to the bottom using existing tabs and woodscrews to the base.

one of the other things I have done is to get most of the landforms complete, and ballasted all the indoor track. more to come soon.

Nice. I wish I had the patience to hand lay my indoor. I will be spiking rail on the trestle I’m building, but other than two bridges I’m pretty much a plastic tie guy.

Jon,

Having learned how to hand lay code 70 in HOn3, code 250 is a breeze. it is all in having the correct tools. I got some of the Micro Engineering snap gauges early on with two of there switches (no longer offered) I have and old Pullman track gauge, and a couple of gauges I had custom machined. with the correct spikes it goes quite quick. I do not spike every tie, as I leave space for future adjustments.

Cross section of the rook section:

(https://www.largescalecentral.com/FileSharing/user_2560/RGSNH/Capture%20(1).JPG)

A couple of more pictures today . these are Banta Model works Miners cabins. they have been built for a long time but were perched precariously on the bench work for many years. fortunately neither ever hit the floor.

Prior to infilling this area with pink foam. I installed servo operated switch stands on all of the wye turnouts.

(https://www.largescalecentral.com/FileSharing/user_2560/RGSNH/20200428_120256.jpg)

(https://www.largescalecentral.com/FileSharing/user_2560/RGSNH/20200428_120324.jpg)

Basic scenery is in place. hope to have this and many other areas complete when we get together this year.

Al P.

Nice. It’s been a few years since I have been there. You have also made great strides in finishing off the room. Looks great!