Large Scale Central

Track work

Worked on the garden railroad today. Have the layout mostly weeded. In the middle of leveling existing road bed. Then I have to put in road bed for the new Fog Bottom bypass. We have a lot of upgrades to the train layout area this year. The hill inside the main loop is getting retaining wall and terrace. Most of the outside of the track area is getting pavers or flagstone.

In your video, the railway track and its surroundings look very beautiful.