The bridge would have been built by the railroad to supply coal to it’s engines from a mine somewhere else. In the case of EBT; down the line a piece.
That entire section, tunnel included is a huge leaf trap. Just add it to the list of stuff to be cleaned up. I’m not going to build the bridge until winter. The track might get there first.