Large Scale Central

Fog Bottom bridge

Got the footings situated and leveled for one of the two bridges that carries the track over a normally dry creek through Fog Bottom. The rocks actually fill a 14" deep trench, which is the drain for the grey water that waters the trees in the island the railroad is built on. Now that the bridge is situated, I can put in the road bed to support the track on either end of the bridge.