      Dual Gauge Turnout Build

      Having built several normal turnouts and frogs I finally got the nerve to try my hand at a dual gauge turnout.  

       

      Our Phase 7 Extension has several and these have been the mental block in putting track down in this section.

       

       

      The first step is to build the dual frogs which is the most difficult part of the turnout.

       

      I use rail from a 5 foot section of Aristo SS track.  Each rail makes one frog with parts left over for points.  I use sectional rail because the rail has 2 holes for attaching each tie section. I cut the rail so that each section of the frog has two holes which I use to screw on a brass plate.  This allows me to align the sections of rail. 

       

      Next step will be to solder the rail to the brass plate and then trim off the extra brass.

       

      Stan

    • May 19, 2016 6:46 PM EDT
      • Post Falls, Idaho
         
      • Posts
        8,286
      • Thanks
        2,374
      • Thanked
        1,327

      interesting challenge.  what are the gauges? 45/32?

      ____________________________________
    • May 19, 2016 8:13 PM EDT

      •  
      • Posts
        9,393
      • Thanks
        249
      • Thanked
        862

      Stan, what solder and flux do you use on the stainless?

       

      Greg

      ____________________________________

      Be sure­ to visit ­my site, l­ots of tec­hnical tip­s and modi­fications,­ and you c­an search ­for topics­ and key w­ords.


      ­Click HERE for Greg­'s web sit­e
      PLEASE NOT­E: Please do NOT use private messaging, i­f you have­ a questio­n, feel fr­ee to emai­l me priva­tely, u­se regular­ email onl­y: greg@el­massian.co­m

    • May 19, 2016 8:24 PM EDT

      •  
      • Posts
        152
      • Thanks
        1
      • Thanked
        13

      The only thing that I am aware of is silver solder with borax flux.

    • May 19, 2016 9:37 PM EDT
      • Phippsburg, Maine
         
      • Posts
        1,138
      • Thanks
        40
      • Thanked
        368

      Stan... That looks great!   I ve been using your old brass rail to build switches... Lots of fun and hard work.   Cannot imagine doing it in stainless... Talk about hard work,   sheesh!  

      This post was edited by Eric Schade at May 19, 2016 9:39 PM EDT
    • May 19, 2016 9:45 PM EDT

      •  
      • Posts
        14,962
      • Thanks
        2,909
      • Thanked
        1,699

      Looks great! I am also interested in the soldering process of stainless to brass.

    • May 19, 2016 10:19 PM EDT
      • Vail, Az
         
      • Posts
        5,439
      • Thanks
        1,982
      • Thanked
        1,368

      Stay brite silver bearing is probably what most should try;

      http://ads.midwayusa.com/product/813132/grobet-stay-brite-high-strength-silver-solder-kit?cm_mmc=pf_ci_google-_-Gunsmithing+-+Tools%2C+Jigs+%26+Fixtures-_-Grobet-_-813132&gclid=CK-E6OzK58wCFU1rfgodzdELaQ

       

      This was the first up in a quick search.

      John

      ____________________________________

      John

       

      The older I get, the less I know, please don't make me prove it.

       

       

    • May 20, 2016 9:00 AM EDT
      • Chelmsford, MA
         
      • Posts
        698
      • Thanks
        43
      • Thanked
        155

      I model in F Scale so the gauges are 70.6mm for standard gauge and 45mm for 3 ft narrow gauge.

       

      The flux I use is Harris Stay Clean.  I use standard 60/40 Rosin Core solder when I am soldering on electrical feeders and Stay Brite 8 when soldering the frogs and tie plates.

       

      When soldering the frogs I use a map gas torch.  When soldering on tie plates I use resistance soldering.

       

      There are three steps.

       

      Step 1 is to use a Dremel tool to grind the rail removing any oxide.

       

       

      Step 2 is to add solder to the rail and brass strip

       

       

      I then wash off the flux and solder the brass to the rail.

       

       

      Once soldered I cut the brass to form a tie plate and screw the plate to the tie.

       

      Long process but it works well.

       

      Stan

       

      This post was edited by Stanley Ames at April 15, 2020 6:46 AM EDT
    • May 20, 2016 1:50 PM EDT

      •  
      • Posts
        9,393
      • Thanks
        249
      • Thanked
        862

      Thank you Stan, nothing helps like understanding a successful procedure.

       

      Greg

      ____________________________________

      Be sure­ to visit ­my site, l­ots of tec­hnical tip­s and modi­fications,­ and you c­an search ­for topics­ and key w­ords.


      ­Click HERE for Greg­'s web sit­e
      PLEASE NOT­E: Please do NOT use private messaging, i­f you have­ a questio­n, feel fr­ee to emai­l me priva­tely, u­se regular­ email onl­y: greg@el­massian.co­m

    • May 26, 2016 7:45 AM EDT
      • Chelmsford, MA
         
      • Posts
        698
      • Thanks
        43
      • Thanked
        155

      Next step in construction was to complete the dual frog by soldering it and then removing the extra brass from the bottom plate

       

      To do this I first had to take off all the individual pieces of rail remove the oxide, add some flux, and put it all back together.

       

      Then the complete assembly is put in a jig to hold it in place and to prevent flexing while soldering.  The left side has been soldered the right side ready for solder.

       

       

      Once soldered the extra flux is washed off and the brass plate is trimmed off.

       

      completed dual frog

       

      Next up the next rainy day will be the outside stock rails and the points.  Lots of grinding to do.

       

      Stan

    • April 4, 2020 12:25 PM EDT
      • Chelmsford, MA
         
      • Posts
        698
      • Thanks
        43
      • Thanked
        155

      Having a large railroad means that there is always something to do and often when a problem is encountered the project is put on hold for awhile and I move on to something else.

       

      Such it was with the construction of a dual gauge turnout.  I ran into a problem on how to build the third frog.  I have built several turnouts for the railroad and one reason it is fairly easy is that I build the frog first and then build the turnout around the frog, As long as the alignment is good it really does not matter much if the degree of the frog angle is not precise.

       

      That is not the case for the third frog.  Since I am building that frog after the others are built its angles need to be precise.  So I set the project aside until I could figure it out.  Over time the workbench I am building it on got cluttered and the project was effectively lost.

       

      Having some extra time I cleaned off the table and at the bottom of the pile was this partially built dual gauge turnout.  I had no idea it had been so long singe I worked on this project.   So over the last week I have been spending some time each day on it and I figured out how to build that pesky frog.  Yesterday I soldered it up and today fitted it on the turnout.  Lots of work still to do to finish the project but now its just doing it slowly as everything else I have done before.

       

      Hopefully in the next month the turnout can find its way to be out on the railroad and I can start the next one.

       

      Stan

       

       

      This post was edited by Stanley Ames at April 5, 2020 9:30 AM EDT
    • April 4, 2020 1:26 PM EDT
      • Fort Myers Beach & Annapolis, Florida & Maryland
         
      • Posts
        2,713
      • Thanks
        125
      • Thanked
        625

      the case for the third frog.

      My understanding is that the D&RGW called them "2 frogs and a toad".

       

      This post was edited by Pete Thornton at April 4, 2020 8:10 PM EDT
      ____________________________________

       

        Pete

    • April 4, 2020 5:51 PM EDT
      • West Grove, Pennsylvania
         
      • Posts
        11,274
      • Thanks
        905
      • Thanked
        1,327

      Your a better man than me, Charlie Brown...........I mean Stan..............

      ____________________________________

      "Nothing in the world is more dangerous than sincere ignorance and conscientious stupidity." --Martin Luther King Jr

    • April 5, 2020 8:32 AM EDT
      • Lancaster, Ohio
         
      • Posts
        694
      • Thanks
        40
      • Thanked
        135

      I've done a few, tedious but doable, mine are all code 332 aluminum so no soldering is needed

    • April 5, 2020 9:39 AM EDT
      • Maryland, USA
         
      • Posts
        2,430
      • Thanks
        1,839
      • Thanked
        1,470

      That's beautiful work, Stan and Gary. I'm truly amazed. 

       

      For standard gauge locos, do you re-gauge, or scratch your own?

      This post was edited by Cliff Jennings at April 5, 2020 9:56 AM EDT
    • April 5, 2020 11:48 AM EDT
      • Fort Myers Beach & Annapolis, Florida & Maryland
         
      • Posts
        2,713
      • Thanks
        125
      • Thanked
        625

      Awesome stuff, especially that curved switch on yours, Gary.

      ____________________________________

       

        Pete

    • April 14, 2020 4:25 PM EDT
      • Chelmsford, MA
         
      • Posts
        698
      • Thanks
        43
      • Thanked
        155

      I am pleased to report that construction on the first dual gauge turnout has finally been completed and it is now out on the layout.

       

      Alas before it can be connected to live track I have to build a second curved one.  Now that I have the procedures down it will just take some time to construct.

       

      First though I have to complete some dual gauge trackage and a standard gauge tunnel.

       

      Stan

       

    • April 14, 2020 4:46 PM EDT
      • Maryland, USA
         
      • Posts
        2,430
      • Thanks
        1,839
      • Thanked
        1,470

      Beauteous, Stan! 

      What are you going to run on your standard gauge track?

       

      [edit] Or is the wider gauge the 40mm, with the narrow being... O gauge? 

      This post was edited by Cliff Jennings at April 15, 2020 6:23 AM EDT
    • April 14, 2020 5:10 PM EDT
      • West Grove, Pennsylvania
         
      • Posts
        11,274
      • Thanks
        905
      • Thanked
        1,327

      ya dun good, old man..............

      ____________________________________

      "Nothing in the world is more dangerous than sincere ignorance and conscientious stupidity." --Martin Luther King Jr

    • April 14, 2020 5:27 PM EDT
      • South Devon, England
         
      • Posts
        1,817
      • Thanks
        180
      • Thanked
        108

      You do not often see dual gauge track, but when you do it is usually quite impressive.  It look great, Stan.

      ____________________________________

      regards, Alan

       Nothing is so strong as gentleness. Nothing so gentle as real strength.  Saint Francis de Sales  French saint & bishop of Geneva (1567 - 1622) 

      https://www.dartmouthrailriver.co.uk

      https://www.buckfast.org.uk/

       

Forums General Track and Trestles

    Icon Legend

  • Topic has replies
    Hot topic
    Topic unread
    Topic doesn't have any replies
    Closed topic
    BBCode  is enabled
    HTML  is enabled

Add Reputation

Do you want to add reputation for this user by this post?

or cancel

Ads by Google