      I've set aside my model of the Grizzly Bar saloon, and started work on a new building for the Mineral Ridge mine and mill. This will be the power house. It will eventually contain a diesel-powered generator, an air compressor for the mine, and possibly a blacksmith's shop. 

       

      The major components (walls, roof, etc) are made from 6mm Sintra: 

       

       

       

      This is the main room. There will be a smaller room added on one side. The floor is 3mm Sintra, and won't be glued in until after I get the roof installed:

       

       

       

       

      The smaller room was also made with 6mm Sintra. I use these steel machinist's blocks to keep everything square:

       

      Here, I've started adding the roof:

       

       

       

      There are openings on the rear of each room, for access to the interior. The rear walls will be removable:

       

       

       

      This is where the structure will sit on the layout:

       

       

       

      Fitting the roof of the side room into the roof of the larger room was a bit tricky. I used scraps of Sintra and some Dynaflex 230 paintable sealant to fill the gaps:

       

       

       

       




      Another shot of the structure temporarily placed on the layout:

       

       

       

      The smaller room will only have one window, located close to the cliff, so there is no need to detail the interior there. But the large room has multiple windows, making the interior fairly visible. The interior is built as a separate model that slides into the rear of the building. Because the exterior will be clad with corrugated metal, for the interior I am simulating the appearance of a a wood-framed structure. The interior walls are scribed to give it a little bit of a corrugated look. The framework is built up out of strips of styrene:

       

       

       

       

       

      That's all for now. Enjoy!



       

       

       

       

       

    • October 12, 2017 2:59 AM EDT
      • Martinez, California
         
      • Posts
        52
      • Thanks
        7
      • Thanked
        1
      • Reputation
        Neutral

      Nice! Can't wait to see more!

      ____________________________________

    • October 18, 2017 10:32 PM EDT

      •  
      • Posts
        4,651
      • Thanks
        53
      • Thanked
        82
      • Reputation
        Well Respected

      A little more progress on the power house...

       

      I made the ceiling for the interior. It is detailed with rafters, and will be attached with screws so that I can remove it to access the interior:

       

       

       

      I also adding some frame detail to the inside of the front wall. This detail had to be carefully placed so it would line up with the removable interior:

       

       

      These shots through the side window shows how it all comes together:

       

       

       



      Next I started on the corrugated metal exterior. I had previously used real, galvanized, corrugated steel from Rainbow Ridge on my Assay Office building, and considered using it again on this one. But this building has more windows and also many more angles and joins, and the steel is difficult to cut or bend. So I went back to making my own corrugated metal out of .001" thick shim brass sheet. This comes in a 6" wide roll, and I cut into 4" x 6" sheets. I heat the sheets of brass with a plumber's torch to anneal them. Then I place each sheet between two pieces of the corrugated steel, and scribe the groove using a dull pencil:

       

       

      I start at one end, and scribe a short section at a time until I've gone more the half the length of the piece. Then I turn it around and start scribing the other end, and meet in the middle. Next I flip it over and scribe the other side. When it's done, I trim off that piece (about 1" wide), remove it, place the remaining brass in between the steel, and start over on the next piece. Tedious, but eventually I get it all done. The pieces of corrugated brass are then sprayed with oven cleaner to wash any residue off. After rinsing with water they are set out to dry. 

       

      I glue the corrugated metal to the structure using Dynaflex 230 paintable sealant. At this time I have completed covering the exterior walls and have just started on the roof:

       

       

       

       

      There is no need to apply metal to the rear walls, since they will be up against the cliff and not visible. In this photo the rear walls have been removed:

       

       


      Here are a couple shots showing how it will look on the layout:

       

       

       



      That's all for now.

       

       

       

       

       

       

      This post was edited by Ray Dunakin at October 19, 2017 2:38 AM EDT
    • October 19, 2017 8:16 AM EDT
      • Marysville, Kansas
         
      • Posts
        410
      • Thanks
        109
      • Thanked
        64
      • Reputation
        Well Respected

      Looking good Ray.

    • October 19, 2017 2:40 PM EDT
      • Pleasanton, CA
         
      • Posts
        100
      • Thanks
        38
      • Thanked
        10
      • Reputation
        Well Respected

      Ray: I love your builds. They are a lot of work to create, but they sure help us newbies to learn effective techniques. Keep up the great work. This building looks like another fantastic addition.

Forums Modeling Modeling

    Icon Legend

  • Topic has replies
    Hot topic
    Topic unread
    Topic doesn't have any replies
    Closed topic
    BBCode  is enabled
    HTML  is enabled

Add Reputation

Do you want to add reputation for this user by this post?

or cancel

Ads by Google