      Hey John, thanks for posting. Lot's of information here and it looks like fun. A question for you. Does JMRI designate when you must "shove" a line of cars or are you doing it manually somehow?
    • March 7, 2017 3:23 AM EST
      • West Grove, Pennsylvania
         
      • Posts
        9,561
      • Thanks
        97
      • Thanked
        145
      • Reputation
        Well Respected

      All JMRI does is tell you what cars go to which industries and what cars get picked up. It's up to you to figure out how to get them in and out. Which can be a real head scratcher sometimes.

      There is a place on the manifest where you can add instructions.

      ____________________________________

      "Nothing in the world is more dangerous than sincere ignorance and conscientious stupidity." --Martin Luther King Jr

    • March 7, 2017 6:57 AM EST
      • Off the Grid
         
      • Posts
        11,832
      • Thanks
        95
      • Thanked
        87
      • Reputation
        Well Respected

      I have tried to figure all of that out in advance and added instructions where needed...

      However, sometimes it just makes more sense to do it differently. Since part of my RR is a balloon track, it's possible to go West and end up going East   Another reason why the track direction is labeled in a few places.

      ____________________________________

      www.cvsry.com www.cvsry.com

    • March 8, 2017 10:13 AM EST
      • Fuquay Varina, North Carolina
         
      • Posts
        35
      • Thanks
        0
      • Thanked
        1
      • Reputation
        Neutral

      I have a question on the willow hill siding.  In JMRI are the 5 locations entered as individual spurs?  This will cause many head aces with pickup and setouts.

      Jay

       

    • March 8, 2017 11:32 AM EST
      • West Grove, Pennsylvania
         
      • Posts
        9,561
      • Thanks
        97
      • Thanked
        145
      • Reputation
        Well Respected

      Well, Jay, that's where all the fun comes in. (not to mention the head scratchin).

      I have a spur in Hesperus with 5 industries on it. 

      In the bottom left is Chandlers Mercantile, then Bergs woodworking(next blue building), further down is Golding Freight(the 2nd red building), Vaggiano's Pawn Shop, right next to it, and at at the end of that spur is Coal Creek Lumber Co.

      If cars are set at Goldings and Vaggianos, and other cars have to be set out at the lumber co, then those cars at Goldings and Vaggiano's have to be moved, usually out on the run around track behind the depot. Then put back to their original location once your done at the lumber co. 

      Another "headache" would be getting cars into Chandlers if there are cars sitting at Bergs. It's up to the engineer and conductor to figure what moves to make. 

      http://www.largescalecentral.com/forums/topic/25591/formal-operations-on-the-rgs

      http://www.largescalecentral.com/forums/topic/25592/operations-on-the-rgs-west-grove-divsion

       

      ____________________________________

      "Nothing in the world is more dangerous than sincere ignorance and conscientious stupidity." --Martin Luther King Jr

    • March 8, 2017 6:40 PM EST
      • Off the Grid
         
      • Posts
        11,832
      • Thanks
        95
      • Thanked
        87
      • Reputation
        Well Respected

      Jay Root said:

      I have a question on the willow hill siding.  In JMRI are the 5 locations entered as individual spurs?  This will cause many head aces with pickup and setouts.

      Jay

       

      Yes, There are 7 'spurs' on the Willow Hill Industrial Track. JMRI knows it simply as the town of Willow Hill and each of those spots are a spur in the software, but in reality just a single track.  This was done intentionally to add a level of difficulty to this very small indoor railroad.

      ____________________________________

      www.cvsry.com www.cvsry.com

    • March 8, 2017 7:52 PM EST
      • Fuquay Varina, North Carolina
         
      • Posts
        35
      • Thanks
        0
      • Thanked
        1
      • Reputation
        Neutral

      Thank You:  That is what I thought.  I have one place that I may try it.

      Jay

    • March 14, 2017 4:10 PM EDT
      • Fuquay Varina, North Carolina
         
      • Posts
        35
      • Thanks
        0
      • Thanked
        1
      • Reputation
        Neutral

      I have added a second location lumber yard and meat packing.  So far it has not been a problem.  The only time that JMRI put a car at each location, the next round, it picked them both up.

      I have two cars that have not moved in some time.  The build report says no moves left.  How do you change the default from 5 to say 10?

      Jay

    • March 15, 2017 4:16 PM EDT
      • Fuquay Varina, North Carolina
         
      • Posts
        35
      • Thanks
        0
      • Thanked
        1
      • Reputation
        Neutral

      I got it figured out.  

      Jay

Forums General Operations

    Icon Legend

  • Topic has replies
    Hot topic
    Topic unread
    Topic doesn't have any replies
    Closed topic
    BBCode  is enabled
    HTML  is enabled

Add Reputation

Do you want to add reputation for this user by this post?

or cancel

Ads by Google